By JET on
Wednesday, June 28, 2000 - 12:16 am:
Vern,
At SMC, the common practice of most buyers is to put the
following information in block 14 of the SF 30: change in
contract value (if any), obligation amount (if any), a one line
description of the modification, and a blurb that says see
attached page(s). The attached page(s)(continuation of block 14)
then include very specifically by UCC order both the purpose of
the modification and explicit detail of the changes to the
affected sections of the contract(i.e. b, f, g.,etc.). Hope this
helps.
By
Joel Hoffman
on Friday, May 12, 2000 - 01:46 pm:
I haven't read those
instructions for block 14 in detail in a long time. Most of the
Corps of Engineers Districts do not cite the reason for the
modification (at least for construction contracts),in block 14.
We confine block 14 to a clear description of all changes in the
contract terms.
We tend to fall back on pre-FAR documentation practices,
documenting "the reason for the modification" and the "reason
for omission from the plans and specifications" in other
documents.
The resource management folks' generally require documentation
to satisfy the "bonafide needs Rule" for the funds. So, the
funds commitment documentation will often include the reason why
the mod is necessary, long before a mod is written.
The Corps used to require various formats for a "Findings of
Fact" or required us to use an old DOD Form as aprice
negotiation memorandum to document the reason for the mod and
the explanation why the work wasn't in the original contract.
Now days, most formats for the "Price Negotiation Memorandum"
and/or "Pre-Negotiation Objective Memorandum" capture this
information.
The Corps also kept statistics on "reason codes" for mods; there
were various ways to capture that data element.
So why repeat the info on the SF-30? It is extraneous to the
info otherwise in the mod file. I don't recall any contractor
being overly interested in such documentation.
The excuse that auditors can review the SF-30 to validate the
reason for the action doesn't save them any time. Anyone
auditing our change process or mods ALWAYS review the mod files,
anyway! Happy Sails! Joel
By
Kennedy How on Friday,
May 12, 2000 - 12:46 pm:
Verne,
In my former office, we didn't have to do any kind of formal
"Determinations and Findings" sort of documentation as to why a
Contract Modification had to be issued. Usually, we would get
various requests to do something, or to tell the contractor to
do something, and that was good enough for most of us. We would
officially document the file when needed, i.e., when we did a
supplemental agreement, and we had pricing reports, PNMs, etc.
In those cases where the contractor is requesting a change,
usually there is sufficient documentation outlining why it's
needed, and there is some concurrence and approvals before this
is needed. Back in the days when we used the "DF", we'd have a
blizzard of paper and flimsies. Today, it's Outlook mail.
Now, it's our practice to set forth exactly what the mods do in
BLOCK 14 (or, most likely, on a Continuation sheet). Basically,
mine usually said "The purpose of this modification is to
incorporate (ECP, RFD/W, Delivery Schedule Extension, etc.) into
(whatever)." There were those instances where we'd write a mod
to incorporate additional scope of work on a ceiling price
basis, change order obligate some amount of money to cover it,
and get the contractor working. We put in language to have him
submit a proposal within some amount of time, for definitization.
Finally, I've seen pretty wordy mods issued by some systems
buyer types. I kinda wondered about those, but each buyer/PCO
had their own methods, and sometimes those are driven by who the
contractor is.
Kennedy
By
Vern Edwards
on Friday, May 12, 2000 - 11:15 am:
P.S. We both know that the
instructions on the back of SF30 say to state the reasons for
the mod in block 14, but neither of us believed that this, in
and of itself, was sufficient to justify doing so.
By
Vern Edwards
on Friday, May 12, 2000 - 11:11 am:
I'd like some input:
A friend and I were discussing contract modification practices
and we found that we disagreed on one issue. The issue was
whether the CO should document the background and reason for the
modification in block 14 of Standard Form 30 or in a separate
memo to file. We have seen it done both ways and each of us had
good reasons for preferring one way or the other.
I know that this is a fairly minor practice issue, but I wonder
if any of you have a preference or if your office has a policy
in this regard. |