Matter of: | Marshall-Putnam Soil and Water Conservation District |
File: | B-289949; B-289949.2 |
Date: | May 29, 2002 |
|
Jill Ketter for the protester.
Alan D. Groesbeck, Esq., Department of Agriculture, for the agency.
Aldo A. Benejam, Esq., and Christine S. Melody, Esq., Office of the General Counsel, GAO, participated in the preparation of the decision.
DIGEST
Under solicitation for offers for leased office space, proposal that failed to
conform to material solicitation requirements for architectural elevation and
landscape plans could not form the basis for award.
DECISION
The Marshall-Putnam (MP) Soil and Water Conservation District protests the award
of a lease to Henry Developers, Inc. under a solicitation for offers (SFO)
issued by the Farm Service Agency (FSA), United States Department of Agriculture
(USDA), for 3,600 square feet of office space. The office space is to
serve as the new USDA Service Center in Henry, Illinois, and will serve Marshall
and Putnam counties. The protester primarily maintains that USDA should
have rejected Henry's proposal as technically unacceptable.
We sustain the protest.
BACKGROUND
FSA issued this SFO on December 12, 2001, contemplating an initial 5-year lease
at a fixed annual price, with one 5-year option period. SFO ¶ 1.3, at 5.
The SFO sought offers for approximately 3,600 square feet of office space in a
new or existing building in Henry, Illinois.[1] At the same time
that FSA issued the SFO, it provided offerors with what appears to be a rough
floor plan indicating the agency's “preferred” layout of the required space.
The SFO listed the following technical evaluation factors in descending order of
importance: accessibility/location; quality/physical characteristics;
layout compatibility; parking; safety; first floor space; fixed rate, fully
serviced lease; proximity of eating facilities; energy conservation; and price.
The SFO provided instructions on the type of information and architectural
details offerors were required to include with their offers. As for price,
offerors were instructed to submit an annual rental rate per square foot for the
initial 5-year term of the lease, and for the option period. Technical
factors and price were of equal importance. Award was to be made to the
offeror whose proposal earned the highest combined score of both price and
technical factors.
Four firms, including the protester and the awardee, responded to the SFO by the
January 11, 2002 closing date. The acting County Executive Director (CED),
who was responsible for conducting this acquisition, excluded one offer from
further consideration, leaving the protester's, Henry's and a third offeror's
proposals in the competition. Both Henry and MP offered new construction.
The third offeror proposed space in what the record refers to as a
“historical” building. Upon his initial review of offers, the CED
noted that with its offer, Henry attached a copy of the rough layout that FSA
had provided, but did not provide any architectural drawings, elevations or
other details about the offered building. Before proceeding to evaluate
offers, the CED sought advice from the FSA State Administrative Officer (AO)
regarding the sufficiency of Henry's plan. According to the CED, the AO
advised him that the rough floor plan Henry attached to its offer would meet the
government's needs.
The CED and an NRCS representative evaluated technical offers by assigning
numerical ratings under each factor and a total score, for a maximum of 50
points in the technical area. Price was evaluated by assigning the maximum
possible score (50 points) to the lowest price, and proportionately lower scores
to higher prices. The table below shows the results of the technical and
price evaluation for the proposals submitted by the protester and the awardee
(prices reflect upward adjustments FSA made to reflect certain required
services):
Offeror |
Price/ Sq. Ft. |
Price Score |
Tech. Score |
Total Score |
Henry |
$13.55 |
50 |
46 |
96 |
MP |
$14.04 |
48 |
46 |
94 |
AR exh. L, Cost and Technical
Analysis.
In a letter dated January 29, FSA notified the protester that it had selected
another firm for the lease. This protest followed.
MP primarily contends that FSA should have rejected Henry's offer as technically
unacceptable because that firm did not include with its offer elevation or
landscape plans allegedly required by the SFO.[2]
Timeliness
USDA requests that we dismiss the protest as untimely. The agency argues
that MP learned that Henry had not included elevation plans with its offer on
February 4, 2002. Relying on 4 C.F.R. § 21.2(a)(2) (2002), USDA
maintains that since MP did not file its protest with our Office until February
19, more than 10 days later, the protest is untimely. USDA also argues that MP
unduly delayed seeking further details about the award to Henry. We
disagree on both counts.
MP explains that it received FSA's award notification letter on February 1.
On February 4, MP telephoned a contractor that assisted MP in preparing its
offer, to inform the contractor that MP had not been selected. According
to the protester, MP learned during that conversation that Henry had contacted
the contractor to inquire whether that firm would be interested in constructing
the new building Henry proposed, and to request that it prepare the building
plans. In response, the contractor apparently suggested that Henry contact
the protester to ask whether MP would be willing to sell existing plans that it
had already prepared for MP in connection with the SFO. By letter on that
same day, MP asked FSA to provide more specific information concerning the award
including the award date, rental rate, the identity of the firm selected,
location of the proposed building, and a copy of the floor and landscape plans
the awardee submitted with its offer. By letter dated February 11, FSA
responded to that request by providing MP with a copy of Henry's complete
proposal. MP subsequently filed the instant protest on February 19.
While the information MP learned during the conversation with the contractor may
have led MP to deduce that FSA had selected Henry, and that the firm's offer
probably did not include architectural or elevation plans, that suspicion alone
was not adequate to trigger the running of the 10-day period for filing a
protest. Even assuming that MP correctly assumed that FSA had awarded
Henry the lease, MP could not have discerned from the conversation with the
contractor what information Henry had included with its offer, the form of that
information, or the level of detail describing the proposed new building for the
agency to evaluate (e.g., architectural drawings, sketches, schematic
plans, landscape, or elevation plans). It was not until after MP received
FSA's February 11 response to its request for additional information that the
protester confirmed that FSA had selected Henry, and that Henry's offer did not
include elevation or landscape plans.
Moreover, contrary to FSA's suggestion, this is not a case where the protester
unreasonably delayed requesting additional information. See, e.g.,
Pentec Envtl., Inc., B-276874.2, June 2, 1997, 97-1 CPD ¶ 199
(protest dismissed where protester delayed debriefing for more than 1 month so
that it could first obtain and evaluate information received under the Freedom
of Information Act and so that its president could attend an unrelated business
conference and take a vacation); Professional Rehab. Consultants, Inc.,
B-275871, Feb. 28, 1997, 97-1 CPD ¶ 94 (protest dismissed as untimely
where protester failed to request debriefing until 2 months after it was
informed that it had not received award). Rather, within 3 days of
learning that FSA had selected another firm, MP asked FSA to provide details
concerning the award. In our view, MP acted diligently in seeking
information that formed the basis for its protest. Accordingly, MP's
protest, filed on February 19, within 10 days after MP received FSA's reply
to its request for information regarding the award, is timely. 4 C.F.R.
§ 21.2(a)(2).
Analysis
MP contends that FSA should have rejected Henry's offer as noncompliant with
material SFO requirements for elevation and landscape plans.
As a preliminary matter, we note that throughout the record, the agency uses the
terms “bid” and “nonresponsiveness” to refer to the offers.
Similarly, the protester alleges that the agency should have rejected the
awardee's “bid” as “nonresponsive.” The agency concedes, however,
that the SFO is essentially a request for proposals. Agency Memorandum of
Law at 3. The record also shows that the agency contemplated treating
offers as in a negotiated procurement--e.g., the SFO provided for
detailed evaluations, and contemplated negotiations prior to award. See
SFO § 1.0, ¶¶ C-J, and § 2.0, ¶¶ 2.1, 2.2, and 2.3.
The references to “bids” and “nonresponsiveness” are, therefore,
inappropriate, since these concepts are not applicable to negotiated
procurements. See Merrick Eng'g, Inc., B‑238706.3,
Aug. 16, 1990, 90-2 CPD ¶ 130 at 2 n. 2. We interpret MP's protest as
contending that Henry's proposal should have been rejected as technically
unacceptable because the firm's offer allegedly did not comply with the SFO
requirements. Accordingly, we analyze the protester's contentions by the
standards applicable to negotiated procurements.[3]
In a negotiated procurement, a proposal that fails to conform to the material
terms and conditions of the solicitation should be considered technically
unacceptable and may not form the basis for an award. See 41 U.S.C.
§ 253b(a) (1994); Rel-Tek Sys. & Design, Inc., B-280463.3, Nov. 25,
1998, 99-1 CPD ¶ 2 at 3; Eigen, B-249860, Dec. 21, 1992, 92-2 CPD ¶ 426
at 4. As relevant here, the SFO contained specific instructions on
the type and level of detail of information offerors were required to submit
with their proposals.
As explained in greater detail below, we conclude that Henry's proposal failed
to satisfy the SFO's material requirements.
The SFO contained the following provision:
Required attachment to all offers:
A. One copy
of a schematic floor plan, preferably drawn to a scale of 1/8 or 1/4 inch to the
foot, indicating the space offered and showing the location of all existing
windows, structural features, and mechanical equipment. Alterations or
other work planned for the purpose of meeting solicitation specification must be
clearly shown on the plans and/or explained in an attached narrative statement.
B. When new construction is proposed, one copy of a plan
drawn to scale and an elevation drawing(s), showing all existing or proposed
improvements and landscaping.
AR, exh. G, SFO ¶ 1.7, at 5.
Consistent with those instructions, the SFO required offerors to submit the
following with their proposals:
4 complete sets of one-eighth inch (preferred) or larger scale
plans that clearly illustrate the space being offered. All architectural
features of the space must be accurately shown in the form of elevations and
wall sections which define the relationships of all required spaces and
construction systems and finish materials. IF CONVERSION OR RENOVATION OF
THE BUILDING IS PLANNED, ALTERATIONS TO MEET THIS SOLICITATION MUST BE
INDICATED. If requested, more informative plans, specifications, or other
information must be provided within 5 working days. Site plan showing
placement of building on site, proposed parking required, and landscape plan is
required.
Id. ¶ A(3) at 6.
There is no question that if an offeror proposed new construction, the SFO
required as an attachment to the offer an architectural plan drawn to scale,
including elevation drawings. There is also no question that the SFO
required that those architectural plans clearly illustrate the space being
offered, and that “all architectural features of the space must be accurately
shown in the form of elevations and wall sections which define the relationships
of all required spaces and construction systems and finish materials.”
SFO ¶ A(3) at 6. As the agency recognizes, “[t]he purpose of
submitting the drawings in the case of new space is to ensure compliance with
the Government's requirements.” AR exh. A, Memorandum of Law, at 11.
Clearly, without these required drawings, the agency simply could not have known
any details of the space it was leasing, the building construction and design,
or materials to be used.
Further, absent detailed architectural plans, drawn to scale, there was no basis
for evaluators to assess several aspects of a proposed new building. For
instance, as relevant to our analysis here, the evaluation factors included an
assessment of the proposed building's “Quality/Physical Characteristics.”
Under that area, evaluators were to assess the suitability of the proposed space
considering the quality of the building design, among other characteristics.
Another factor assessed layout compatibility (i.e., whether the proposed
space would provide a quality layout for furniture, equipment, and employees).
Similarly, the proposed building was to be evaluated for safety characteristics,
particularly the structural safety of the proposed building.[4]
We fail to see, and the agency does not explain, how these material
characteristics of a building that did not exist at the time of the
evaluation--worth 50 percent of the technical evaluation--could reasonably be
evaluated without the type and level of detailed information that elevation
plans are intended to provide. In our view, the SFO requirement that
offerors submit with their proposals elevation and landscape plans, drawn to
scale, clearly relates to elements of the offered building that are material to
the needs of the government.
The agency does not dispute, and the record shows, that Henry failed to provide
the required elevation and landscape plans. Instead, Henry attached to its
offer one copy of the rough floor plan FSA had provided with the SFO, showing
the agency's “preferred” layout of the required space. That rough
sketch, however, is not drawn to scale, does not show elevations, and does not
include landscape plans, as the SFO required.
The record also shows that during FSA's initial review to determine completeness
and acceptability of offers, and again during the evaluation, FSA questioned
whether Henry's proposal satisfied the SFO's requirements for floor plans and
elevation drawings. AR exh. C, Acting CED Statement, Mar. 25, 2002, at
1-2. The evaluators apparently determined that any failure of Henry's
proposal to satisfy the SFO's requirements in this regard could be treated as a
“minor” informational deficiency that could be corrected after the lease was
awarded. Id. at 2. While the SFO did provide that “[i]f
requested, more informative plans, specifications, or other information must be
provided within 5 working days,” the fact that the awardee may, after award,
agree to be bound to a solicitation's material requirements does not render the
proposal acceptable or the award proper. Universal Yacht Servs., Inc.,
B-287071, B-287071.2, Apr. 4, 2001, 2001 CPD ¶ 74 at 5 n.7; Tri-State Gov't
Servs., Inc., B-277315.2, Oct. 15, 1997, 97-2 CPD ¶ 143 at 4. In sum,
since Henry's proposal did not satisfy the SFO's material requirements for
elevation and landscape plans, the agency's acceptance of the firm's proposal
was improper.
USDA argues that MP was not prejudiced by any errors here because, even if
discussions are held, and revised proposals are received and reviewed, the award
decision will not change. The premise of USDA's argument is that Henry
will provide the details missing from its proposal and that its technical score
will not change. The agency's argument ignores the fundamental problem
with the evaluation here: the agency improperly made assumptions about the
building that Henry proposed—and concluded that it not only satisfied the
government's needs, but warranted a nearly perfect technical score—with no
evidence before it of the actual features of the building being proposed.
Since the additional information Henry may submit with a revised proposal is
unknown at this point, there simply is no basis to conclude that the technical
evaluation scores will remain the same after submission and evaluation of
revised proposals. USDA also maintains that opening discussions at this
point to cure errors in the procurement would essentially create an improper
auction because prices have been revealed. We view the risk of an auction
as secondary to the importance of correcting an improper award and preserving
the integrity of the competitive procurement system through appropriate
corrective action. Spectrofuge Corp. of North Carolina, Inc.--Recon.,
B-281030.3, Apr. 9, 1999, 99-1 CPD ¶ 65 at 2-3.
Finally, regarding the price evaluation, FSA has essentially conceded that it
did not use the most current information available to adjust offerors' prices.
In this connection, USDA has presented two explanations of how FSA calculated
price adjustments, and offered a third calculation during a telephone conference
that our Office conducted with the parties. While MP's rate remains higher
than Henry's under any version of these calculations, it appears that the
difference between Henry's and MP's rates becomes smaller with each subsequent
calculation. Despite our repeated requests for the agency to provide
documentation supporting its revised calculations, the agency has failed to do
so.
In order to address the issues of Henry's nonconforming proposal and the
appropriate price adjustments, we recommend that the agency hold discussions,
request revised proposals from Henry and MP,[5] reevaluate those
proposals, and document the evaluations.[6] Regarding price
adjustments, we recommend that the agency use the most current data available to
determine appropriate price adjustments, if necessary. We further
recommend that the agency make a new source selection decision based on the
results of the technical and price evaluations, and terminate the awarded lease
if Henry is not selected for award. We also recommend that MP be
reimbursed the reasonable costs of filing and pursuing its protest. 4
C.F.R. § 21.8(d)(1). MP's certified claim for costs, detailing the
time spent and the costs incurred, must be submitted to the agency within 60
days after receiving this decision.
The protest is sustained.
Anthony H. Gamboa
General Counsel
[1]
FSA conducted this acquisition on behalf of itself and another USDA agency, the
Natural Resources and Conservation Service (NRCS). The agency explains
that NRCS offices often share space with the local Soil and Water Conservation
Districts. Since 1937, various states, territories and Native American
tribal governments have enacted legislation creating local conservation
districts. There are approximately 3,000 local districts nationwide
responsible for developing soil and water conservation programs, and for
assisting land owners and operators plan and maintain sound conservation
programs. Each district is considered a unit of county government, not
part of USDA, and operates independently pursuant to state law, using local and
state funding. See Agency Report (AR) exh. I, USDA Departmental
Regulation No. 1340-1, July 7, 1983. In this case, the protester, MP,
is the local district.
[2] Alternatively, MP argues that it was unreasonable for FSA to
award nearly the maximum number of technical points to the awardee's offer,
while awarding identical high scores under all technical evaluation factors to
MP's proposal. Since we sustain the protest and recommend that FSA
reevaluate revised offers, we need not address this contention.
[3] FSA maintains the Federal Acquisition Regulation does not apply
to the procurement here because FSA is conducting it pursuant to the independent
leasing authority of the Commodity Credit Corporation (CCC). See 15
U.S.C. § 714b (2000). (FSA is the agency within USDA charged with
carrying out CCC programs. Agency Memorandum of Law at 1; USDA Memorandum,
July 8, 1986, at 3.) Nevertheless, FSA concedes that the procurement is
subject to the Competition in Contracting Act of 1984. Supplemental Agency
Report, Apr. 4, 2002, at 3.
[4] In fact, the record shows that the evaluators considered this to
be an important feature of the proposed building, and downgraded the third
offeror's proposal primarily due to concerns with the proposed building's
structural safety. AR exh. C, Acting CED Statement, Mar. 25, 2002, at
2.
[5] We recognize that in response to the protest, one evaluator
expressed concern that MP's floor plan deviated from FSA's “preferred”
layout. However, the evaluation record does not contain any narrative
explanation of the evaluators' concerns, and there is nothing in the record to
indicate how MP's floor plan deviated from the agency's preferred layout.
In the absence of such contemporaneous evaluation documentation, we cannot
determine whether those concerns are reasonably based. Nevertheless,
implementation of our recommendation will allow the agency and MP to address
such concerns with MP's proposed building.
[6] For our Office to perform a meaningful review of an agency's
selection determination, the agency is required to have adequate documentation
to support its evaluation of proposals and its selection decision. OSI
Collection Servs., Inc., B-286597, B-286597.2, Jan. 17, 2001, 2001 CPD
¶ 18 at 8, 12; Biospherics, Inc., B-278508.4, et al., Oct.
6, 1998, 98-2 CPD ¶ 96 at 4. Here, we note that except for
assigning numerical scores to the proposals under each of the evaluation
factors, the record is devoid of any contemporaneous documentation supporting or
explaining the evaluations.